Your New Bathroom. Done in 2–4 Days.
Demo, plumbing, tile, fixtures, vanity, glass — one local crew, one timeline, one clean job site. Same trade pros from rough-in to walkthrough.
Free, no-obligation estimate within 24 hours.
- Starts at $4,999
- Consult in 2 days
- Estimate in 24 hours
- Licensed & Insured · NJ HIC #13VH13153500
- Tub-to-shower conversions with frameless glass
- Custom tile work, heated floors, and curbless showers
- Full plumbing fixture replacement and rough-ins
- Vanities, mirrors, lighting, and storage
- Permits pulled and inspections handled for you
Four ways most bathrooms start.
Pick the scope that matches your project. Final pricing comes back as a line-item estimate — every fixture, every allowance, in writing.
-
RefreshVanity, Fixtures, Paint, Lighting
Same footprint, new finish. Swap the vanity, faucet, toilet, lights, and mirror for a sharper everyday bath.
- New vanity, top, faucet, and mirror
- New toilet, lighting, and accessories
- Paint and minor repairs
Starts at $4,999
-
Shower / TubShower or Tub Replacement
Same footprint, new fixture. Swap a tired shower or tub for a fresh install — no rerouting plumbing, no moving walls.
- Demo and removal of existing unit
- New shower pan, tub, or surround
- Updated valve, shower head, and trim
Starts at $5,999
-
Tub-to-ShowerTub-to-Shower Conversion
Pull the tub-shower combo and build a tiled walk-in — curbless threshold, lit niche, frameless glass.
- Demo and rough-in plumbing changes
- Large-format porcelain tile and niche
- Frameless glass door or panel
Starts at $6,999
-
Full GutFull Gut Renovation
Down to the studs. New layout, subfloor, plumbing, electrical, ventilation, tile, fixtures, vanity, and glass.
- New layout, subfloor, and ventilation
- Plumbing and electrical rough-ins
- Full tile, fixtures, vanity, and glass
Starts at $12,999
Most bathrooms wrap up in 2–4 days. Final pricing depends on layout, materials, and finish choices. Free estimate within 24 hours of the consult.
Four stages. Every bathroom.
Same crew, one timeline. Each stage carries its own promise.
-
Stage 01 · Within 2 days
1The consult
- Free in-home consultation
- Measure, listen, scope the space
- Booked within 2 days of your request
Consult booked
In-home walkthrough · 45 min
Wednesday
9:30 AM
Within 2 days
✓ Confirmed
-
Stage 02 · Within 24 hours
2Quote + 3D render
- 3D rendering before any tool comes out
- Line-item digital estimate
- eSign from your phone
Estimate sent
Live URL · eSign from phone
Bathroom — Mt. Laurel
$20,751.50
+ line-item allowances
3D render
✓ Included
-
Stage 03 · 1–2 days
3The design
- Finishes locked in with the homeowner
- Material at supplier rates
- Allowances tracked live, line by line
Allowances
Live shared URL · client can add links
Shower Door $1,000 Purchased Toilet $250 Selected Vanity Faucet $75 Purchased + 6 more line items being curated… Total budget
$4,220
-
Stage 04 · 2–4 days
4The build
- Same crew start to finish
- Permits, inspections, daily cleanup
- Final walkthrough + 1-yr warranty
Build complete
Walkthrough + warranty active
Final walkthrough ✓Daily site photos ArchivedWorkmanship 1-yr warrantyBuild window
2–4 days
Day one: a real estimate, not a guess.
Most contractors send a one-page PDF with a single total and a vague allowance footnote. We send a designed document with your bathroom rendered, every line itemized, every allowance in writing — signable from your phone.
- Your bathroom rendered in 3D — before you sign
- Every line itemized, every allowance written down
- Build window, design window, and 50/50 payment split on the same page
- Signable from your phone with one tap
Recent work
Real bathrooms we've finished.
Drag the slider on each — every one is a real install.
-
BeforeAfter
Toms River bathroom — tub-to-shower conversion — Toms River, NJ -
BeforeAfter
Mount Laurel bathroom — frosted-glass stall to spa walk-in — Mount Laurel, NJ -
BeforeAfter
Cherry Hill primary bath — tub-to-shower conversion — Cherry Hill, NJ
Ready when you are.
Tell us about your project. You'll get a free, no-pressure quote with a clear timeline — usually within a few days.


